Informations
Solution ID
Description of solution
Summary (Challenges; Objectives)
              Between 1950 and 1970 the torrent Wengener Argen was regulated and two drop structures were implemented. 2005 the two drop structures were replaced with river bed ramps and the river bed was widened.
Location Latitude
              47.6767000000
          Location Longitude
              10.1449000000
          Keywords
Ecosystem (s) impacted
          Riverfront
              Hazard(s) concerned
          Floods
              Other challenges
          Biodiversity
              Other keyword
              fish passability
          Exposition
Exposed assets
          Urban settings
              Is there population exposed?
              Yes, medium density of population ( between 50 and 200 persons/km2)
          Activity
Are there jobs created in the nature-based sector?
              No
          Are there new employments in tourism sector, sport activities or recreational activites ?
              No
          Are there new activities in the tourism sector , sport activities or recreational activites?
              No
          Are there new/traditional activities that increased?
              I don't know
          International classification
Sustainable development goals addressed
          SDG 14 – Life below water
              Sendai Frameword priorities addressed
          Priority 3. Investing in disaster risk reduction for resilience
              Actors
Who are the beneficiaries of the action
              Inhabitants of Wengen
          Organizations involved in the implementation of the action
              Water authority Kempten, Konstruktionsgruppe Bauen (Kempten), company Hubert Schmid (Marktoberdorf),
Temporal aspects
Design life time of the action
              More than 10 years
          Implementation time of the action
              Between 2 and 5 years
          Financial aspects
Comment
              including the technical flood protection
          Financing source
              78 % Free State of Bavaria, 22 % Municipalidad Weitnau
          Others
Participatory process
              No
          Is it possible to transpose this action in a different context?
              No, it is site specific
          Evaluation
Risk reduction
Hazard
              +
          Exposure
              +
          Vulnerability
              +
          Feasibility
Technical Feasibility
              0
          Economic Feasibility
              0
          Environment
Water
              0
          Soil
              0
          Vegetation
              +
          Landscape
              0
          Biodiversity
              +
          Society
Quality of Life
              +
          Community involvement
              0
          Landscape Heritage
              0
          Economy
Revitalization
              0
          Local Economy
              0
          1340000.00
      
  
    
Wengen (Markt Weitnau)