Informations
Solution ID
Description of solution
Summary (Challenges; Objectives)
              To improve flood protection and the habitat quality for flora and fauna and to prevent depth erosion in the Lech the project LIFE Lech II, consisting of 11 measures, was brought to life. The water authority Kempten is project partner and project sponsor of the measure C11 close to Füssen. 8 groynes were built to reactivite the relocation of the Lech and to develop a branched wild river landscape. The groynes are constructed according to the "Instream River Training" principle. They are significantly reduced in height compared to classical groynes and will help the Lech to develop itself from the inside out. In addition, a spur was created to divert the main flow of the Lech.
Technical characteristics
              8 groynes and a spur
Location Latitude
              47.5566000000
          Location Longitude
              10.6812000000
          Keywords
Ecosystem (s) impacted
          Riverfront
              Hazard(s) concerned
          Erosion
              Other challenges
          Biodiversity
              Exposition
Exposed assets
          I don’t know
              Is there population exposed?
              Yes, medium density of population ( between 50 and 200 persons/km2)
          Activity
Are there jobs created in the nature-based sector?
              Don't know
          Are there new employments in tourism sector, sport activities or recreational activites ?
              Don't know
          Are there new activities in the tourism sector , sport activities or recreational activites?
              Don't know
          Are there new/traditional activities that increased?
              I don't know
          International classification
Sustainable development goals addressed
          SDG 14 – Life below water
              Sendai Frameword priorities addressed
          Priority 3. Investing in disaster risk reduction for resilience
              Temporal aspects
Design life time of the action
              More than 10 years
          Implementation time of the action
              Less than 2 years
          Financial aspects
Comment
              Costs for the complete LIFE Lech project
          Others
Is it possible to transpose this action in a different context?
              No, it is site specific
          Evaluation
Risk reduction
Hazard
              +
          Exposure
              +
          Vulnerability
              +
          Feasibility
Technical Feasibility
              -
          Economic Feasibility
              NA
          Environment
Water
              0
          Soil
              +
          Vegetation
              +
          Landscape
              +
          Biodiversity
              +
          Society
Quality of Life
              0
          Community involvement
              NA
          Landscape Heritage
              NA
          Economy
Revitalization
              0
          Local Economy
              0
          6093220.00
      
  
    
border between Austria and Germany