Licca Liber - The Lech river from barrage 23 to the outlet Augsburg: Section 2

    Solution ID
    Description of solution
    Summary (Challenges; Objectives)

    The second section is similar to the first. The existing crash structure is to be removed to allow a self-dynamic development on the western side of the river. For this purpose, the river bank protection must be removed. In contrast to the first section, the foreland width in section 2 is only about 80 m. Since there is not enough space for a self-dynamic development, a comprehensive dike relocation is aimed for. This will mobilize additional bedload reserves, give the river more open space and connect large areas of floodplain forest to the Lech. Also the possibility of a foreland removal to establish a secondary softwood floodplain should be considered for this location. In order to preserve the Weitmannsee, the right bank will remain fortified and should be designed close to nature. By deconstruction of the drop structures in combination with a widening of the river bed, the stability of the river bed shall be achieved without additional supporting structures.The measures are part of the project Licca Liber. 

    Location Latitude
    48.2859000000
    Location Longitude
    10.9448000000
    Keywords
    Ecosystem (s) impacted
    Riverfront
    Hazard(s) concerned
    Erosion
    Other challenges
    Biodiversity
    Exposition
    Exposed assets
    I don’t know
    Is there population exposed?
    No
    Activity
    Are there jobs created in the nature-based sector?
    Don't know
    Are there new employments in tourism sector, sport activities or recreational activites ?
    Don't know
    Are there new activities in the tourism sector , sport activities or recreational activites?
    Don't know
    Are there new/traditional activities that increased?
    I don't know
    International classification
    Sustainable development goals addressed
    SDG 14 – Life below water
    Sendai Frameword priorities addressed
    Priority 3. Investing in disaster risk reduction for resilience
    Actors
    Organizations involved in the implementation of the action

    Free State of Bavaria, Municipality Augsburg, water authority Donauwörth

    Temporal aspects
    Design life time of the action
    More than 10 years
    Implementation time of the action
    Don’t know
    Others
    Participatory process
    Yes
    Is it possible to transpose this action in a different context?
    Yes, but difficult to transpose
    Risk reduction
    Hazard
    +
    Exposure
    +
    Vulnerability
    +
    Feasibility
    Technical Feasibility
    +/-
    Economic Feasibility
    +/-
    Environment
    Water
    0
    Soil
    +
    Vegetation
    +
    Landscape
    +
    Biodiversity
    +
    Society
    Quality of Life
    +
    Community involvement
    +
    Landscape Heritage
    0
    Economy
    Revitalization
    ?
    Local Economy
    ?