Restoration of the Attel at the area of Hofberg

    Solution ID
    Description of solution
    Summary (Challenges; Objectives)

    The water authority improved the ecological situation of the Attel b creating a permanently flowed side arm, with a altering shore line and slope angles. Natural structure elements implemented in the riverbed produce flow diversity and improve the habitat quality for fish. The created retention area contributes to reduce flood peaks. 

    Location Latitude
    47.9895000000
    Location Longitude
    12.0630000000
    Keywords
    Ecosystem (s) impacted
    Riverfront
    Hazard(s) concerned
    Floods
    Other challenges
    Biodiversity
    Exposition
    Exposed assets
    Agriculture
    Is there population exposed?
    No
    Activity
    Are there jobs created in the nature-based sector?
    No
    Are there new employments in tourism sector, sport activities or recreational activites ?
    No
    Are there new activities in the tourism sector , sport activities or recreational activites?
    No
    Are there new/traditional activities that increased?
    I don't know
    International classification
    Sustainable development goals addressed
    SDG 13 – Climate action
    Temporal aspects
    Design life time of the action
    More than 10 years
    Implementation time of the action
    Less than 2 years
    Others
    Is it possible to transpose this action in a different context?
    Yes, it is easily transposable
    Risk reduction
    Hazard
    ?
    Exposure
    +
    Vulnerability
    ?
    Feasibility
    Technical Feasibility
    +
    Economic Feasibility
    +
    Environment
    Water
    ?
    Soil
    ?
    Vegetation
    +
    Landscape
    ?
    Biodiversity
    +
    Society
    Quality of Life
    ?
    Community involvement
    ?
    Landscape Heritage
    ?
    Economy
    Revitalization
    ?
    Local Economy
    ?